gnavistart_XotNannRS
gnaviend_XotNannRS
  1. HOME
  2. Project
  3. North America, CT-121 FGD Project

Project

North America, CT-121 FGD Project

CT-121 FGD for Plant Bowen of Georgia Power

CT-121 FGD for Plant Bowen of Georgia Power
Location North America Year of Completion Unit 1 in 2010 / Unit 2 in 2009 / Unit 3 in 2008 / Unit 4 in 2008
Scope of Work Environmental
Technology
Plant CHIYODA THOROUGHBRED 121 (CT-121) Flue Gas Desulfurization (FGD) Process
Capacity Unit1, 2;
3,267KNm3/h
(750MW)/
Unit 3, 4; 4,067KNm3/h
(950MW)
Scope License
Client Georgia Power, Southern Company Location Cartersville, GA, USA

North American project to install CHIYODA THOROUGHBRED 121 (CT-121) FGD system at Plant Bowen of Georgia Power under the control of Southern Company (SoCo), which is a major utility company in the US. Plant Bowen is the largest power station of Georgia Power with two 750MW boilers and two 950MW boilers. The CT-121 FGD system has been installed for each unit. Chiyoda licensed the CT-121 process to Southern Company Services, Inc. (SCS), which is a subsidiary of SoCo. SCS has worked as the EPC contractor for this project. Chiyoda has checked and reviewed the SCS design, and dispatched engineers for construction and commissioning. SCS configured a “design template” of the CT-121 FGD system for a 750MW and a 950MW size unit at the beginning of their Environmental Program. The same CT-121 system design has now been applied to nine other coal fired boiler units in the SoCo territory.